Friday, 30 June 2017

Vale of Tiers



The Use and Abuse of the Tier 1 Solar Panel Classification


Marketeers have latched on to this designation as a way of shifting more solar panels, but what does it actually mean?  Is a solar panel from a so-called "Tier 1 manufacturer" of higher quality?

What is a Tier 1 Solar Panel Manufacturer?


Bloomberg New Energy Finance (BNEF) is a research consultancy that provides financial information and analysis to investors in the Clean Energy sector.  BNEF tracks large-scale solar farm development projects, their value, the solar panels used and what kind of finance has funded the development.

Banks that finance solar farms can do so with either 'recourse' or 'non-recourse' finance.    Non-recourse finance means that the bank has no charges over the assets of developer that builds the solar farm, so it will want to be confident that if there's a problem once the farm is handed over it can all be sorted out under the warranty of the solar manufacturer. Consequently banks have a 'whitelist' of solar panel manufacturers that they will accept on projects financed on a non-recourse basis.   BNEF realised that its knowledge of development projects allowed it to infer which manufacturers were whitelisted by banks.  It developed a classification to create a list of 'major' or  'bankable' solar panel manufacturers and subscribers to its services can access this list to help inform investment decisions.


Under the BNEF scheme, a tier 1 manufacturer is defined as one that has sold its own-brand, own-manufacture panels to six projects larger than 1.5MWp (around 6,000 panels) in the past 2 years, where the financing of those projects was by six different banks and the finance was 'non-recourse' finance.

To complicate matters further, there are other, competing businesses also offering reports listing tier 1 solar manufacturers based on their own methodologies, for example Navigant Research has released lists in the past.

A few observations immediately arise:


  • The list is dynamic - companies are leaving and entering the list the whole time.
  • The list is backward-looking - if banks decided not to use panels from a certain manufacturer any more, it could take 2 years before that manufacturer lost its tier 1 status based on the way BNEF monitors the market
  • The criteria is a financial one, some would argue that it is an indirectly measure of the quality of the product - but the banks arguably care most about the continuing ability of the manufacturer to rectify problems  
  • The list is not publicly available - which makes it difficult to check claims
  • There is more than one company providing lists - some manufacturers will appear on one list but not others


Just Add Marketing Stardust


People trying to shift solar panels to consumers and businesses have latched on to this tier 1 categorisation with predictable results.  Here are a few promotional claims harvested from different company websites (not naming any names)


  • "We have chosen the solar panels we offer based on quality, efficiency and value we only use Tier 1 solar panels."  
  • "We use the very best performance-guaranteed, tier 1 products" 
  • "the performance of tier 1 products will always outweigh the quality of their competitors" 
  • "we believe in only using the best, which are the Tier 1 solar panels." 


A deliberate confusion of panel quality with the tier 1 list has created the impression that 'tier 1 panels' are better.  Are they?

Is a Tier 1 Solar Panel a Better Solar Panel?


BNEF itself is clear that being on the list is not a direct measure of the quality of the product or even financial stability of the company that made it:

"We strongly recommend that module purchasers and banks do not use this list as a measure of quality, but instead consult a technical due diligence firm....the classification is purely a measure of industry acceptance.  There have been many examples of quality issues or bankruptcy of Tier 1 manufacturers".

So, lets turn to a technical due diligence firm for advice.  Fortunately one such company, DNV.GL  produces an annual report of its findings and recently published this years - the PV Module Reliability Scorecard Report 2017   .  In this document, the accreditation and testing laboratory reports the reliability test results for more than 50 commercially available PV  solar panel models, which, according to the company, makes it the most complete publicly-available comparison of PV module reliability.  They claim that it covers most of the leading manufacturers active in the market today.

The tests are similar to those used in EN61215 type approval testing, comprising thermal cycling, dynamic mechanical load, damp heat, humidity freeze and PID (potential induced degradation).

Power loss after accelerated lifetime testing - products from large manufacturers are shown in orange and are found among the best and the worst performing panels


Critically DNV.GL "do not see a direct correlation between the size of the manufacturers and the performance in accelerated testing".  The graph above shows the power loss after panels had endured artificial aging through thermal cycling.  The results coloured with the orange bars are products from the top-10 global manufacturers by volume.  Some small manufacturers obtained very good results, while some large manufacturers produced panels with poorer performance in this test.


So the take home is– Tier 1 is not what it sounds like, and it’s certainly not the guarantee of quality that sales people from some solar companies are presenting to customers.

Buyer Beware.







Friday, 19 May 2017

Energy Efficiency Regulations - Private Rented Properties

England and Wales 


Is the legislation in England and Wales Collateral Damage of the Green Deal fiasco? 

 In 2015 UK Government introduced legislation creating a minimum energy efficiency standard for homes and commercial properties that are rented out - the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015 

This legislation captures around 9% of private rented properties in England (see my earlier blog: How Energy Efficient is UK Housing Stock?) - the Impact Assessment reckoned this would be around 360,000 homes that will need to have an EPC raised from F or G level (based on 2012 housing stats).

These houses would have needed an energy efficiency upgrade upon being re-let after April 1 2018 and by April 1 2020 if the tenancy didn't change first.

The legislation also covered non-domestic buildings. The impact assessment reckoned that 18% of business properties have an EPC of F or G this adds around 200,000 buildings to the total requiring an energy refurbishment.

However, in a ham-fisted attempt at joined up legislation, the government linked the legislation to the Green Deal.

This hopeless scheme was going to "transform Britain's buildings" by offering funded energy upgrades. Householders and social landlords were going to queue up to insulate their homes because the cost of repaying the loan would be less than the money saved on future energy bills. (Who could have possibly predicted that this wouldn't be an easy sell?)

It was ignominiously withdrawn in July 2015 having written only 14,000 Green Deal financing schemes due to its bewilderingly bureaucratic design and the unappealing interest rates offered on the loans.  (Damning National Audit Office report here)


How has the withdrawal of the Green Deal impacted the regulations on privately rented homes?

Here's an extract from the Impact Assessment associated with the regulations for private rented properties:

From 1st April 2016, landlords of a domestic property may not unreasonably refuse requests from their tenants for consent to energy efficiency improvements, where financial support is available that ensures no upfront costs to landlords for the measures, such as the Green Deal, the ECO, tenant’s own funds, or national or local authority grants.  
 From 1st April 2018, all new lettings or tenancy renews of applicable private rented properties in the domestic and non-domestic sectors should be brought up to a minimum EPC rating of an ‘E’ if this can be achieved with no upfront costs. 

By adding the requirement that the only energy efficiency improvements that have to be made are those with no upfront costs, the whole thing is effectively defunct. With the Green Deal gone, and precious few local authority grants around the only way that a building is going to be improved is if the tenant pays for it!

The regulations need to be urgently amended to require the Landlord to upgrade the property - perhaps with a cost cap (see information on new Scottish regulations below).


Meanwhile in Scotland... 


This issue looked as if it had been kicked into the long grass in Scotland after the working group tasked with developing Regulation of Energy Efficiency for the Private Sector (REEPS) seemed to get bogged down and put on ice in 2015, (naturally Westminster was blamed for this).

The only regulations affecting private landlords was a rather lame requirement to get an energy assessment (with recommendations) done - but without having to  action any of the recommendations.

However, Scot Gov has sprung into action and designated energy efficiency as a National Infrastructure Priority and published a consultation on a Scottish Energy Efficiency Programme (SEEP).

 Plans for energy efficiency requirements in the private rented sector have also been revealed in a consultation published in April 2017. The proposal is to legislate for privately rented houses covered by the so-called "repairing standard" which will need to meet a minimum energy efficiency rating on the Energy Performance Certificate (EPC).

For new tenancies after 1 April 2019 the house will have to achieve an EPC rating of no worse than EPC band E. After 1 April 2022 (called the backstop date) all privately rented homes will have to achieve this minimum standard, irrespective of a tenancy change. 

Scottish goverment estimates that this change will affect 30,000 properties.

 Where the EPC shows a band of F or G, the owner will need to have a "minimum standards assessment" carried out and lodged on the EPC register before renting out the property. This new assessment is closely based on the EPC methodology, but will include recommendations of the lowest-cost technically appropriate measures to bringing the house up to the required energy standard.

 The owner will have to bring the property up to the standard required by the assessment within six months of the date of the assessment, but subject to a proposed cost cap of £5000.

The minimum standard ratchets up to EPC D, for new tenancies after 1 April 2022, with a backstop date of 1 April 2025.

The property owner will be responsible for getting the improvements required by the minimum standards assessment done. Local authorities will have the power to issue civil fines of up to £1,500 against any owner who does not comply with the standard.


The proposals for Scotland look very good.  If implemented, it would result in a clear process that can deliver low carbon buildings in this sector through the regular tightening of the requirements (beyond those mapped out to 2025).  The proposals seem to be a good mixture of ambition and realism.

By contrast, England and Wales is in disarray in this area and as in the regulation of so many other sectors (new homes, social housing), Scotland is showing the way.


Thursday, 6 April 2017

What is a PERC Solar Cell?




 This article was written by guest blogger, Dr KT Tan, Technical Director at Viridian Solar


What is the fuss about PERC?



Anyone who follows the latest developments in the Solar Photovoltaic market will have come across the technical term  PERC at least once in the past year or so. All respectable suppliers compete to launch the best PERC as a means to secure the premium part of the market share.

PERC stands for Passivated Emitter Rear Cell; the concept was first proposed by the University of New South Wales in a grant report in 1984 (1). As a matter of fact, the modern PERC generally refers to two specific configurations called PERT (Passivated Emitter, Rear Totally-diffused), and PERL (Passivated Emitter, Rear Locally-doped), which have proven to be the most viable solutions amongst other PERC configurations (2).

The PERC concept has taken some time to meet with commercial success, with the first high efficiency solar cells being fabricated in a lab with up to 20% efficiency from the 1990s onwards (3). Obviously at the time, there were other competing technologies, e.g. back contact and HIT. Hence, the PERC concept was only one of many promising ideas to increase solar cell efficiency. It took nearly 30 years for the industry to catch up with the concept and produce efficiencies achieved at the research level.

How does a PERC Solar Cell work?


In a nutshell, a PERC solar cell can be created by adding a rear surface passivation film to a conventional crystalline cell. In practice, it involves two additional steps: first, a rear passivation film is applied. Then, either lasers or chemicals are used to open up tiny pockets in the film through which the rear conducting layer can contact the silicon below the passivation layer. Figure 1 compares the configurations of conventional and PERC solar cells.

Figure 1: Comparison of cell configurations 
The above technique enables the efficiency of the solar cell to be improved in three ways:


1. By minimising surface recombination


The atoms at the surface of a silicon wafer have 'dangling bonds' which can capture charge carrying electrons and pull them back into the silicon crystal structure (a process called surface recombination).  As a result, when an electron reaches the back surface of a conventional solar cell, it is likely to be captured and does not contribute to the current.   However in a PERC solar cell, a passivated film is grown on the back surface of the solar cell and reduces this effect by tying up the 'dangling bonds'.  A charge carrying electron that strays too close to the back surface is allowed to continue on its way and the chance it will reach the emitter and contribute to the electric current produced by the solar cell is increased.  (Figure 2).

Figure 2 - How a PERC cell increases efficiency by decreasing surface recombination.

Longer wavelengths (red light) generate electrons near the back surface, compared to shorter wavelengths (blue light) (4). Since the PERC solar cell helps prevent surface recombination, it will still be able to capture these wavelengths (5). This capability increases the solar cell performance during mornings and evenings when longer wavelengths are present, which leads to the claims of better weak light performance by many manufacturers.



2. By Increasing Internal Reflectivity to Capture More Light


The rear film reflects the light that passes through the solar cell without being absorbed. This provides the light with more opportunity for a second absorption attempt (see Figure 3). In other words, the efficiency of energy conversion is just becoming higher.



Figure 3 PERC cell increases efficiency by reflecting light back through the solar cell


 

3. By Reflecting Counter-productive Wavelengths


Generally, silicon solar cells stop absorbing wavelengths above 1180 nm, instead they are absorbed by the backside metallisation layer and tuned into heat (4). The rear passivated film reflects these counter-productive wavelengths out of the solar cell and hence maintains cooler temperatures. As a result, PERC solar cells are considered to have better heat resistance.

All of the above, if manufactured correctly, will undoubtedly increase the solar cell efficiency. The current commercially available PERC solar cells are in excess of 20% with a record efficiency of nearly 23%. As this technology is piggybacked on conventional silicon solar cells, you can bet the efficiency will not stop here and will keep on improving!

Why has it become the most exciting feature amongst the new PV technologies?


It has been a holy grail in the PV industry to find a product with the highest possible efficiency, while maintaining the low manufacturing cost. To some extent, PERC solar cells provide the answer. Hence, it is not surprising that this technology has a rosy outlook.

From standstill, the PERC commercial production capacity is expected to occupy nearly half of the total solar PV cell capacity by 2020 (see Figure 4) (6).


Figure 4: Global production capacity for PV cells from 2016 to 2020 (Source: Energy Trend)



The main attraction is that the PERC production requires minimum modifications to existing solar cell manufacturing lines. The existing lines can easily be upgraded to produce PERC solar cells without having to invest in large capital expenditures or completely overhaul the entire lines.
In other words, one could increase the solar cell efficiency without having to take huge financial risks. Meanwhile, by recycling most of the existing equipment, one simply makes the money work harder for the original investment. It appears to be a no brainer.


Too good to be true?

Despite the PERC being a thirty year old concept, they have not been tested commercially until quite recently. It was first reported by Ramspeck (7) that PERC cells can exhibit stronger power degradations during the early days through a process called light-induced degradation (LID).

Fraunhofer Centre for Silicon Photovoltaics in Germany subsequently conducted extensive research to find out the degradation mechanism due to illumination (8). They were mainly attributed to chemical and physical root causes, namely Boron-oxygen complex activation and Iron-boron pair dissociation for the former, and elevated temperature for the latter.

To be fair, LID is not a new phenomenon, affecting conventional solar cells too. This type of degradation has simply entered the spotlight with the introduction of mass-produced PERC solar cells.

In response, some cell manufacturers have addressed the issue by adopting small changes to the solar cell process, such as modified process temperatures and different wafer materials (9).


Conclusions


PERC is going to take centre stage in the foreseeable future. This technology will progressively take a bigger market share – the benefits to developers, designers and installers are obvious.

Sooner or later, most of the PV modules will feature this technology. One just has to carefully choose trusted, quality suppliers with proven test records.

This fuss is, after all, worth paying attention to.


References


1. M.A. Green, A.W. Blakers, J. Kurianski, S. Narayanan, J. Shi, T. Szpitalak, M. Taouk, S.R. Wenham and M.R. Willison, Ultimate Performance Silicon Solar Cells, Final Report, NERDDP Project 81/1264, Jan. 82-Dec. 83 (dated Feb., 1984).

2. M.A. Green, The Passivated Emitter and Rear Cell (PERC): From conception to mass production, Solar Energy Materials & Solar Cells, 143 (2015) 190-197.

3. C.J. Chiangand, E.H. Richards, A 20% efficient photovoltaic concentrator module, conferencerecord,21st IEEE Photovoltaic Specialists Conference, Kissimmee, May 1990, pp.861–863.

4. D. de Rooij, PPERC solar cell technology: why will PERC dominate silicon cell technology? 2015 (http://sinovoltaics.com/solar-cells/perc-solar-cell-technology-will-perc-dominate-silicon-cell-technology/).

5. PERC cells: production costs down, efficiency up. May 2016. (https://www.pv-magazine.com/press-releases/perc-cells-production-costs-down-efficiency-up_100024647/)

6. TrendForce Reports PERC Cell’s Global Production Capacity to Reach 25GW in 2017, Resulting in Doubling of Total Annual Output. 19/1/2017 (http://press.trendforce.com/press/20170119-2737.html)


7. Ramspeck, K. et al. 2012, “Light induced degradation of rear passivated mc-Si cells”, Proc. 27th EU PVSEC, Frankfurt, Germany, pp. 861–865.


8. Tabea Luka, Christian Hagendorf & Marko Turek, Multicrystalline PERC solar cells: Is light-induced degradation challenging the efficiency gain of rear passivation? Photovoltaics International, 2016

9. Haase, J. Mono as well as multi PERC cells will get a significant market share, PV Magazine 10/2015, pp.74 -77.


Thursday, 9 March 2017

Higher Standards for Housebuilders Do Not Slow Development




The Truth has Been Revealed by Scottish Developers

NOTE - a new blog with updated data is available here

Housing developers say that if you make them build more energy efficient homes, they'll cost more and less houses will be built.

Our politicians have swallowed this argument hook line and sinker time and again.

I've written about this before - the flaw in the argument is the assumption that the developers costs have to rise. They don't. This is because one of the main costs of building the house is what you pay for the land, and if everyone is faced with the same regulations, then the value of the land is driven down and the landowner makes a slightly smaller profit from the deal.

Developers have successfully held up tighter building regulations on numerous occasions.

  • The update to building regulations in England in 2012 ended up as only a 7% reduction in carbon emissions (compared to the significant cut required in the original zero carbon homes policy)
  • In Scotland in 2012 there was no energy efficiency improvement at all.
  • The Housing Standards Review resulted in legislation in 2015 with the intent of limiting local authorities powers to require higher energy efficiency homes through planning (legislation that is still not in force).
  • Finally, after 10 years of clear policy direction, one of George Osborne's last acts before disappearing off to take lucrative directorships, was to tear up the Zero Carbon Homes plan (the existence of which had been mendaciously used to justify the changes in the Housing Standards Review).

So it's very interesting to see what's been happening in Scotland. After many years of shadowing Westminster on building regulations (apart from the obvious requirement to go just a percentage point or two lower on carbon emissions to make a point), Scotland really pulled ahead with its changes to regulations in 2015.  The graph at the top of this piece shows the gap opening up.

If developers' claims that higher levels of regulation would stop housebuilding in its tracks were true, you'd expect housebuilding in Scotland to have gone off a cliff.  Has it?



Has it hell.






The Merton Rule is Not Dead, Long Live the Merton Rule!






Can Local Authorities Still Require Energy Efficiency Higher Than Building Regulations?



The largest housing developers would very much prefer it if they were able to build the same house in Aberdeen that they build in Abingdon. If they can do this, then the cost of the architect and engineers to design their standard properties can be spread across more units, and their buying power can be increased by using the same component parts in every house they build. This is one of the ways they out-compete smaller, more local building companies.

For this reason they dislike local rules and regulations that affect the houses they build.

In 2008 UK government enacted the Planning and Energy Act, which among other things clarified that local planning authorities had the legal right to require energy efficiency standards in new homes that exceeded the national building regulations. This approach to pushing developers to build housing with an energy performance beyond the national minimum had become known as the 'Merton Rule' after the local authority in London that had pioneered the approach.

Here's what the Act says:

1  Energy policies
(1)A local planning authority in England may in their development plan documents, and a local planning authority in Wales may in their local development plan, include policies imposing reasonable requirements for—
(a) a proportion of energy used in development in their area to be energy from renewable sources in the locality of the development;
(b) a proportion of energy used in development in their area to be low carbon energy from sources in the locality of the development;
(c) development in their area to comply with energy efficiency standards that exceed the energy requirements of building regulations.

It has been estimated that around 50% of local authorities took advantage of the new clarity to build such requirements into their local plans.

National builders didn't like it. They didn't like it at all. Different local authorities chose to ask for 10% renewable energy on site, 20% renewable energy on site, Code for Sustainable homes level 4.

The national developers were faced with different requirements up and down the country, a situation further complicated for them by the fact that different local authorities enforced their planning requirements with different levels of enthusiasm and competence. In some areas, particularly those areas that combine both high housing need and low house prices, developers might find a planning requirement for renewable energy on new developments to be highly negotiable. Other local authorities, notably in the south, with high house prices that means developers are queuing up to build new homes there, have been far more successful at holding the line on the aspirations of their development plans.

It could be argued that this is exactly as it should be. The UK has very high geographical differences in house prices. Local authorities could set their local planning regulations to achieve the highest energy performance that was consistent with the economics of housing development in their area, specifically whether the value of development land is sufficient to cover the additional costs of more efficient homes.

However, in 2015 things swung back towards the large developers. The government of Cameron and Osborne announced a 'bonfire of regulations' to free business from costly red tape. The Housing Standards Review was formed to look at red tape afflicting the house builders. Developers successfully argued that this patchwork of local planning requirements was 'red tape' and the review concluded that it should be swept away.



The government chose to add the changes to the Deregulation Act 2015. Section 43 of this Act amends the Planning and Energy Act as shown below.

43 Amendment of Planning and Energy Act 2008
In the Planning and Energy Act 2008, in section 1 (energy policies), after subsection (1) insert—
“(1A)Subsection (1)(c) does not apply to development in England that consists of the construction or adaptation of buildings to provide dwellings or the carrying out of any work on dwellings.”

This amendment would remove the ability of local authorities (in England only) to require developers to exceed the building regulations for energy efficiency. Note that sections 1(a) and 1(b) remain, allowing local authorities to continue to require that a percentage of the energy consumption of a new development to be met with renewable or low carbon energy.

The passing of the Deregulation Act is, however, not the last word in this story. If you work in a local authority in England and a housing developer is telling you that you can't impose higher standards than building regulations on a development, they're wrong. The fact is that section 43 has not yet been brought into force, so the original Planning and Energy Act text still applies.

If you look at the Commencement Section of the Deregulation Act, you'll see how the various elements of the Act are to be brought into force.

Some sections come into force on the day the Act is passed in parliament, others some set number of months later. No special mention is made of section 43, so it falls under this provision:

(7)Except as provided by subsections (1) to (6), the provisions of this Act come into force on such day as the Secretary of State may by order made by statutory instrument appoint.

A check of statutory instruments shows that this has not yet happened for Section 43, fully two years after the Act itself was passed by Parliament.

In fact, during a Lords debate on the Neighbourhood Planning Bill, in response to a question by Baroness Parminter, Lord Bourn confirmed that it was the case that local authorities still have powers to require higher building standards:

"The noble Baroness asked specifically whether local authorities are able to set higher standards than the national ones, and I can confirm that they are able to do just that."

So there you have it, the Merton Rule lives on!

 Local authorities still have powers to drive low carbon development in England, and it's just as well because our central government seems to have lost the will to do so. It's down to the sustainability officers and planning officers to enforce their local plans and they have the power to do so.

The Residual Valuation Model



Why Legislators Have Nothing to Fear from Tougher Building Standards





Simple isn't it? A chain of logic that seems irrefutable.

Legislate to make developers build better (low energy) homes and their build costs will rise.
These homes will not command a higher price, because the market is dominated by the price of existing homes for sale.
So the developer will make less profit.
Less homes will be built at a time when the country desperately needs them.

Our politicians have been buying this argument again and again from well-funded lobbyists working on behalf of housing developers.

The flaw in the logic is the assumption that the developers costs have to rise when you increase building standards. They don't. This is because one of the main costs of building the house is what you pay for the land, and if everyone is faced with the same regulations, then the value of the land is driven down and the landowner makes a slightly smaller profit from the deal.

The windfall from selling land to developers is so significant that a small decrease in the value is not going to slow down the market.



Tuesday, 4 October 2016

Thin Film Solar PV vs Silicon Wafer - Which is Better?

A guest article by Dr KT Tan cuts through the marketing to find out



Figure 1 (Source: Jethro Betcke, Oldenburg University, Germany)

Thin film solar PV was hailed as the next big thing in solar nearly a decade ago. Then, crystalline silicon wafer (c-Si) cells occupied more than 80% of the market share compared to thin film PV (1). There was a high anticipation in the industry for thin film PV to position itself for a run at c-Si and dominate the market for the near future. However, 10 years on, history shows that not only did thin film fail to conquer the market, but its market share has subsequently declined to only 7% (2).

Obviously, one major factor was due to the collapse of the price for c-Si cells, which quickly wiped off the cost advantages of thin film technologies. This blog is not going to discuss the reasons for this distorted market competition, caused mainly by the exponential expansion of production in c-Si cells, but to question and compare the technical merits of thin film PV versus c-Si.

Do thin film PV technologies have an arsenal of special features to outperform c-Si cells? 



Low Light Performance


The first common belief is that thin film solar PV performs better in low light conditions or diffuse sunlight (for example on a cloudy day). But is this true? The fact that this has been heavily promoted by the marketing guys is because these two technologies do have different spectrum responses to solar light. In other words, their ability to convert solar energy to electricity varies at different wavelengths. In general, the average wavelength in diffuse sunlight is shorter (i.e. more blue) that of direct sunlight – so if you have a spectral response peaking at short wavelengths, e.g. thin film amorphous silicon (a-Si), then you would perform better under diffuse conditions than clear sky conditions.

Figure 1 for shows the different spectrum responses of different solar technologies against the power of sunlight of different wavelengths at sea level at mid-lattitudes of Earth (called AM1.5).  Crystalline monocrystalline silicon (labelled m-Si) is compared against different thin film solar technologies based on amorphous silicon (a-Si), Copper Indium Gallium Selenide (CIGS) and Cadmium Telluride (CdTe).

If you look at Figure 1, you probably would have noticed that not all thin film technologies have the same performance response to differing light wavelengths. Thin film CIGS solar panels, for example, have a broad spectrum response akin to mono-crystalline wafer cells (m-Si), so based on this their performance in diffuse lighting conditions would be little different to m-Si.

Amorphous Silicon has a quite significantly different spectral response to crystalline silicon, with a greater response to low wavelength light.  So how do they compare in field trials? Figure 2 illustrates the results of a comparative study between a-Si and c-Si on a cloudy day. On average, the tests show an increase in energy generated of 15% for a-Si at low irradiance levels below 260 W/m2.  (Note: the tests were published by NexPower, a manufacturer of amorphous Silicon panels)
Figure 2 (Source: NexPower In-house test report)
 

However, performing better on cloudy days is of little benefit if it is combined with performing less well on sunny days (when more energy can be collected). If this were the case then the advantage of thin film PV under diffuse conditions might be a complete red-herring created by the marketing gurus.

A recent research project (3) supported by the Deutsche Bunderstiftung Umwelt (German Federal Foundation for the Environment) compared several solar module types (including thin film and c-Si) under North German Climatological conditions in a side by side trial for a year, and it turned out that no significant difference between the performances of the different type of modules could be found .


Shading


Let’s move on to the second common claim, that thin film PV are more immune to shading effects. There is no magic physics in thin film technologies that make them less tolerant to PV’s number one enemy – partial shading, except that the cells in thin film panels are usually very long and narrow (5 to 10mm wide and the whole length of the panel). In this case, the likelihood of total cell shading is diminished, provided that the installer has correctly oriented the solar modules. Most modern thin film solar modules have further split the narrow cell into multiple sections and incorporated by-pass diodes (4). Nevertheless, if they are not oriented wisely to avoid potential shadows, then it is back to square one (See figure 3).

Figure 3a: Correct orientation to shading           Figure 3b: Incorrect orientation to shading
(Source: Technical Note – Optimising Thin-Film Module PV Systems by SolarEdge)


High Temperature


Finally, how about the claims for superior heat resistance of thin film PV? This is perhaps the only undisputable advantage of thin film technologies – intrinsically, they all have a better temperature coefficient compared to s-Ci (5). In other words, their performance does not degrade as quickly as s-Ci when cell temperatures increase above 25oC.  However, as figure 4 shows, different thin film technologies display a wide variation in temperature response.  Amorphous Silicon (a-Si) is least affected by temperature, whereas CIGS solar panels are very similar in performance to crystalline Silicon.

Fig. 4 Variation of Power Output with Temperature for Different Solar Technologies
 Source: Virtuani. A, Pavanello. D and Friesen. G. Overview of Temperature Coefficient of Different Thin Film Photovoltaic Technologies, 25th European Photovoltaic Solar Energy Conference and Exhibition. 2010, Spain.


A comparative study between amorphous silicon and crystalline silicon suggests the benefit can be up to 20% more output on a hot day with an average ambient temperature of 34oC. See Figure 5. (Note: the tests were published by NexPower, a manufacturer of amorphous Silicon panels).

Figure 4 (Source: NexPower In-house test report)


Although the above result may sound impressive, you may be wondering which parts of the world regularly has an average ambient temperature above 30oC. Unsurprisingly, some research bodies in countries likes, Thailand (6) and India (7), have recommended thin film PV for precisely this reason.

In Summary


Bringing all these factors together, a collaborative research project carried out by Universities of Stuttgart and Cyprus compared thin film PV and c-Si by measuring actual performance over many years in Cyprus (8). The data has obviously taken into account all the differences in spectrum responses and temperature coefficients, the results are summarised in Figure 5.  Data for four years is presented from 2007 (labelled a) to 2010 (labelled d). The clear conclusion from this multi-year side by side test is that thin film modules do not outperform crystalline silicon modules.

Figure 5 Muli-Year Comparison of Solar Energy Yield from Different Technologies
(Source: Reference 8 – page 222)


There appears to be no clear technological advantage for thin-film PV against c-Si at present. In order for thin-film PV to experience a revival, there must be other factors involved which would make thin film PV more attractive than crystalline silicon solar PV. 

For example the homogenous appearance of thin film panels may make them look more appealing.
Thin film solar can be printed on any thickness of substrate and combine with other materials to form see-through graphics, stained glass, company logos, and blinds. With the ability of being semi-transparent, they could even mimic the appearance of natural materials, for example wood or marble.

Needless to say, apart from such niche applications, thin film PV also needs to gain more headroom in cost advantage against c-Si to offset a lower overall efficiency. Until then, it seems like c-Si will stay on top for now.




References:


(1) http://www.marketsandmarkets.com/Market-Reports/thin-film-pv-31.html
Renewable Energy Sources and Climate Change Mitigation: Special Report of the Intergovernmental Panel on Climate Change
(2) Photovoltaics Report by Fraunhoher Institute for Solar Energy System. 6 June 2016www.ise.fraunhofer.de
(3) FLINS Project (www.flins-projekt.de) hosted by Universitat Oldenburg, Germany (http://www.uni-oldenburg.de/en/physics/research/ehf/energiemeteorology/research/former-projects/flins/).
(4) Correspondence with NexPower (www.nexpw.com )
(5) Overview of Temperature Coefficients of Different Thin Film Photovoltaics Technologies by Alessandro Virtuani, Diego Pavanello, Gabi Friesen at 5th World Conefrence on Photovoltaic Energy Conversion, Spain (https://www.researchgate.net/publication/256080289)
(6) Investigation on Temperature Coefficients of three types Photovoltaic Module Technologies under Thailand Operating Condition by P. Kamkird, N. Ketjoy, W. Rakwichian and S. Sukchai. Published on Procedia Engineering 32 (2012) 376 – 383.
(7) Variation of Temperature Coefficient of different technology Photovoltaic modules with respect to irradiance by P. Dash and N. Gupta. Published on International Journal of Current Engineering and Technology, Vol. 5, No. 1 (Feb 2015).
(8) Performance of Photovoltaics under Actual Operating Conditions by G. Makrides, B. Zinsser, M. Norton and G. Georghiou (pages 201 to 232). Third Generation Photovoltaics ISBN 978-953-51-0304-2. March 2012.